Environmental & Social Impact Assessment (IFC/WB Funded)
Serial No.
Name of The Plant
Capacity (MW)
Job Description
Completion
Year
1.
Electricity Generation Company of Bangladesh Limited(EGCB), Super Critical Coal Based Power Plant at Munshiganj for EGCB.
300-400 MW
EIA, SIA, RAP & DIA
Ongoing
2.
Bangladesh Inland Water Transport Authority (BIWTA),Bangladesh Regional Waterway Transport Project 1
Third Party Monitoring & Evaluation
Ongoing
3.
Baraka Patenga Power Ltd., A Heavy Fuel Oil Based Power Plant
50
IEE/ESIA, Air & Noise Emission Dispersion Modeling
2012
4.
Regent Energy & Power Ltd., Ghorashal, Dhaka, A Gas Based Power Project
108
IEE/ESIA, Air & Noise Emission Dispersion Modeling
2012 – 13
5.
Environmental Study of Ashuganj 450 MW (South) Combined Cycle Power Plant
450
Aquatic Survey, Soil & Ground Water Survey, Emission Modeling, ESMMP, ESMS, Thermal Plume Modeling & WMP
2013
6.
Environmental Study of Ashuganj 225 MW Combined Cycle Power Plant at Ashuganj Power Station Company Ltd. Complex (A World Bank Group Financed Project)
225
Aquatic Survey, Soil & Ground Water Survey, Emission Modeling, ESMMP, ESMS, Thermal Plume Modeling & WMP.
2013
7.
Dhaka Southern Power Generation Ltd. at Nababganj, Dhaka. A HFO Fueled Power Plant Project
55
IEE/ESIA, Air & Noise emission Dispersion Modeling.
2013
8.
United Ashuganj Energy Ltd., A Combined Cycle Gas Forced Power Plant (IFC/World Bank Financed Project.)
200
IEE/ESIA, Air & Noise Emission Dispersion Modeling
2014
9.
Orion Power Dhaka Ltd. (Coal Based Power Plant), Gazaria, Munshiganj. (A USExim Bank Financed Project)
630
IEE/Environmental site clearance, Baseline Environmental data generation, Socioeconomic study and stakeholder consultation for ESIA.
2013
10.
Orion Power Dhaka Ltd. (Coal Based Power Plant), Mongla, Bagerhat. An USExim Bank Financed Project)
IEE/Environmental site clearance, Baseline Environmental data generation, Socioeconomic study and stakeholder consultation for ESIA.
2002 – 2015
11.
Karnafully Dry Dock Ltd., Anwara, Chittagong
IEE/Environmental site clearance, Baseline Environmental data generation, Socioeconomic study and stakeholder consultation for ESIA.
2003 – 2014