Environmental & Social Impact Assessment (IFC/WB Funded)

AECL has successfully completed the assignment for the following IFC/WB and other international lender funded projects:

Serial No.

Name of The Plant

Capacity (MW)

Job Description

Completion

Year

1.

Electricity Generation Company of Bangladesh Limited(EGCB), Super Critical Coal Based Power Plant at Munshiganj for EGCB.

300-400 MW

EIA, SIA, RAP & DIA

Ongoing

2.

Bangladesh Inland Water Transport Authority (BIWTA),Bangladesh Regional Waterway Transport Project 1

Third Party Monitoring & Evaluation

Ongoing

3.

Baraka Patenga Power Ltd., A Heavy Fuel Oil Based Power Plant

50

IEE/ESIA, Air & Noise Emission Dispersion Modeling

2012

4.

Regent Energy & Power Ltd., Ghorashal, Dhaka, A Gas Based Power Project

108

IEE/ESIA, Air & Noise Emission Dispersion Modeling

2012 – 13

5.

Environmental Study of Ashuganj 450 MW (South) Combined Cycle Power Plant

450

Aquatic Survey, Soil & Ground Water Survey, Emission Modeling, ESMMP, ESMS, Thermal Plume Modeling & WMP

2013

6.

Environmental Study of Ashuganj 225 MW Combined Cycle Power Plant at Ashuganj Power Station Company Ltd. Complex (A World Bank Group Financed Project)

225

Aquatic Survey, Soil & Ground Water Survey, Emission Modeling, ESMMP, ESMS, Thermal Plume Modeling & WMP.

2013

7.

Dhaka Southern Power Generation Ltd. at Nababganj, Dhaka. A HFO Fueled Power Plant Project

55

IEE/ESIA, Air & Noise emission Dispersion Modeling.

2013

8.

United Ashuganj Energy Ltd., A Combined Cycle Gas Forced Power Plant (IFC/World Bank Financed Project.)

200

IEE/ESIA, Air & Noise Emission Dispersion Modeling

2014

9.

Orion Power Dhaka Ltd. (Coal Based Power Plant), Gazaria, Munshiganj. (A USExim Bank Financed Project)

630

IEE/Environmental site clearance, Baseline Environmental data generation, Socioeconomic study and stakeholder consultation for ESIA.

2013

10.

Orion Power Dhaka Ltd. (Coal Based Power Plant), Mongla, Bagerhat. An USExim Bank Financed Project)

IEE/Environmental site clearance, Baseline Environmental data generation, Socioeconomic study and stakeholder consultation for ESIA.

2002 – 2015

11.

Karnafully Dry Dock Ltd., Anwara, Chittagong

IEE/Environmental site clearance, Baseline Environmental data generation, Socioeconomic study and stakeholder consultation for ESIA.

2003 – 2014

Environmental & Social Impact Assessment (ESIA & EIA)IFC/WB Funded Projects