Consultancy Service on IEE, ESIA, EMP & RAP (Ongoing)

AECL is a pioneer in the field of Initial Environmental Examination (IEE), Environmental & Social Impact Assessment (ESIA), Environmental Management Plan (EMP) and Resettlement Plan (RAP). The list of the ongoing services in that sector is presented below:
1.EIA of Lafarge Holcim extension project at Chatak, Sylhet.
2.IEE & EIA of Ashugonj 100MW HFO based Power Plant at Ashugonj, Brahmanbaria.
3.IEE & ESIA of Reliance 750*2 MW LNG Based Power Plant at Jhuidandi, Bashkhali, Chittagong.
4.IEE & EIA of Bengal Gas Limited at Mongla, Bagerhat.
5.EIA of Kalatoli-Laboni Walk-way & Cycle-way at Cox’sbazar.
6.IEE & EIA of Petrobangla Techno-Economic Feasibility Study and Engineering Services for Construction of Two No’s Land Based LNG Terminal.
7.IEE & EIA of Land base LNG Terminal at Moheshkhali, Cox’sbazar.
8.IEE & EIA of 660*2 MW Coal based Power Plant by UREC at Dhalghata, Matarbari, Cox’s Bazar.
9.IEE & EIA of Decan LPEG at Mongla, Bagerhat.
10.IEE & EIA of Apollo LPEG at Chandpur.
11.IEE & EIA of Minigrid project at Noria & Vedorganj in Shariatpur.
12.IEE & EIA of Chittagong Border Road Construction Project (Rangamati-Khagrachari-Bandarban CHT Districts) at Chittagong.
13.EIA of 2 bridges of SASEC Road Connectivity Project from Joydebpur to Elenga.
14.IEE & EIA of 360MW CCPP Duel Fuel Power Plant in Mymensingh.
15.IEE & EIA of BSCIC Industrial Estate, Sreemangal, Moulovibazar.
16.IEE & EIA of Thanchi-Remakri-Mawdak-Likri Road Construction Project.
17.IEE & EIA of Alikadam-Jalanipara-Kurukpata-Powamohuri Road Construction Project.
18.IEE & EIA of Mirsarai 150MW Duel Fuel (Gas/HFO) power project at BEZA area in Mirsarai, Chittagong.

Environmental & Social Impact Assessment (ESIA & EIA)Environmental Management Policy (EMP)Initial Environmental Examination (IEE)Ongoing ProjectResettlement Action Plan (RAP)