Serial No.

Name of Plant

Year of Completion

Job Description

1.

Petrobangla (Bangladesh Oil, Gas & Mineral Corporation).

2021,2018

IEE,ESIA,RAP

2.

Bengal Gas LImited

2018

IEE,EIA

3.

China Huanqiu Contracting and Engineering Co. Ltd. (HQC)

2018

Feasibility Study,IEE

4.

Decan LPEG

2018

IEE,EIA

5.

Apollo LPEG

2018

IEE,EIA

6.

Mymensingh 360 MW Dual Fuel (Gas/HSD) Combined Cycle Power Plant Project, Rural Power Company Ltd. (RPCL), Bangladesh.

2018

EIA,RAP

7.

Mirsarai 150 MW Dual Fuel (Gas/HFO) Engine based Power Plant Project,BPDB-RPCL (B-R) Powergen Limited,Bangladesh

2018

IEE, EIA,RAP

8.

Reliance Power, India, Bangladesh

2017

IEE, ESIA

9.

Orion Gas Ltd. (An Orion Group Company at Mongla, Khulna)

2013

IEE, EIA

10.

Bangladesh Gas Fields Company Ltd.

2009

IEE, EIA

11.

KDS Minerals Ltd.

2008

IEE

12.

Gas Sector Development Project, 5 Gas Fields, Asian Development Bank (ADB).

2005

RAP

13.

Gas Distribution Network in Rajshahi City and it’s Adjacent Areas..

2004-05

IEE, EIA

14.

Gas Supply Network in Bogra Town,Pashchimanchal Gas Company Limited (PGCL)

2004

IEE, EIA

15.

Phulbari Coal Mine Project, Asia Energy Corporation (Bangladesh) Pvt. Ltd.

2002

IEE

16.

Premier LP Gas Limited.

2001

IEE, EIA