Explore All of Our Best Projects

Adroit Environment Consultants Ltd. (AECL) has successfully completed numerous environmental studies, monitoring, and management projects across Bangladesh. Our work supports industries, infrastructure, and development organizations in ensuring environmental compliance, sustainability, and community safety.

We provide end-to-end solutions including Environmental Impact Assessment (EIA), Initial Environmental Examination (IEE), Environmental Monitoring, Wastewater Treatment Plant Design, and Pollution Control Measures.

Project Highlights

AECL has successfully delivered projects including the design of STP & ETP, environmental and social impact assessments (ESIA/IEE), and air, water, noise, and soil monitoring for industries and power projects. We also support clients with environmental clearance, compliance monitoring, and sustainability solutions, ensuring eco-friendly growth and regulatory compliance.

Feature Projects

Our All Projects

EIA & ESIA Projects

Project Name Location Client Duration
Environmental Impact Assessment (EIA) of Proposed 25 MW Solar Power Project
Athangiri, Moulvibazar
JV of Paramount Holdings Ltd. & Paramount Textile Ltd.
July 2025 – Ongoing
Environmental Impact Assessment (EIA) of Proposed 25 MW Solar Power Project
Athangiri, Moulvibazar
JV of Paramount Holdings Ltd. & Paramount Textile Ltd.
July 2025 – Ongoing
Environmental & Social Due Diligence (ESDD) Audit of VIP Luggage Bangladesh
Plant 03, 04, 06 & 07 of Mongla EPZ, Mongla, Bagerhat
Environmental Management Centre Pvt. Ltd, India.
June, 2025- Ongoing
Providing Services (Baseline Survey) for Preparatory Survey on Haor Area Resiliance and Development Project in Bangladesh (JICA Funded)
09 Haors of Kishoreganj, Sunamganj, Sylhet & Moulvibazar
Nippon Koei Co. Ltd., Japan
May 2025 – Ongoing
Quarterly E&S Monitoring of U. K. Bangla Cement Limited (UKBCL)
Hoseindi Economic Zone, Gazaria, Munshiganj
U. K. Bangla Cement Limited (City Group)
May 2025 – Ongoing
Consultancy Services for the Environmental Monitoring of Operational Phase of Matarbari 2×600 MW Ultra Super Critical Coal Fired Power Plant
Matarbari, Cox’s Bazar
Coal Power Generation Company Bangladesh Limited (CPGCBL)
May 2025 – July, 2027
Environmental & Social Management Plan (ESMP) and Monitoring Plan for Operation Phase of 100 MW Solar Power Plant
Hemayetpur, Pabna
Dynamic Sun Energy Pvt. Ltd.
April 2025 – May 2025
Preparation of Safeguards and Social Monitoring Report (SSMR) of 100 MW Solar Power Plant
Hemayetpur, Pabna
Dynamic Sun Energy Pvt. Ltd.
March 2025 – April 2025
Preparation of Stakeholder Engagement Plan (SEP) of 100 MW Solar Power Plant
Hemayetpur, Pabna
Dynamic Sun Energy Pvt. Ltd.
March 2025 – April 2025
Preparation of Compensation Close Out Report (CCOR) of 100 MW Solar Power Plant
Hemayetpur, Pabna
Dynamic Sun Energy Pvt. Ltd.
February 2025 – March 2025
Environmental and Social Impact Assessment (ESIA), Environmental and Social Compliance Audit (ESCA) and Resettlement Plan/ Livelihoods Restoration Plan (RP/LRP) of the proposed 100MW Solar Power Project (ADB funded)
Hemayetpur, Pabna
Dynamic Sun Energy Pvt. Ltd.
March 2023-Aug 2023
Environmental & Social Impact Assessment (ESIA) of U. K. Bangla Cement Limited (UKBCL)
Hoseindi Economic Zone, Gazaria, Munshiganj
U. K. Bangla Cement Limited (City Group)
June, 2024 – November, 2024
Environmental and Social Impact Assessment (ESIA) and Resettlement Action Plan (RAP) Preparation of Landing Stations/Launch Ghats and Passenger Terminal of Bangladesh Regional Waterway Transport Project 1 (Package No. BRWTP-S6A)
Chittagong- Dhaka-Ashuganj IWT Corridor
Bangladesh Inland Water Transport Authority (BIWTA)
May, 2024 – Ongoing
Initial Environmental Examination (IEE), Environmental and Social Impact Assessment (ESIA) and Resettlement Action Plan (RAP) of Proposed 100 MW ac Solar Power Project (DoE Requirement)
Khanganj & Chandoni Union, Rajbari
Sungrow Renewables Development Bangladesh Limited
May 2024 – Ongoing
Environmental and Social Impact Assessment (ESIA) of Proposed 10 MW Solar Power Project
Kagabala, Moulvibazar
Moulvibazar Solar Power Limited
May, 2024 – Ongoing
Quarterly Environmental Monitoring of 2X660 MW Coal Fired Thermal Power Project of SS Power I Limited (Operation Phase)
Banskhali, Chattogram.
SS Power I Limited
December, 2023 – Ongoing
Environmental & Social Impact Assessment (ESIA) of Paramount Textile PLC (DoE Requirement)
Sreepur, Gazipur
Paramount Textile PLC
November, 2023 – March, 2024
Initial Environmental Examination (IEE) of the Transmission Line (~20 km) for the Patuakhali 1320 MW Coal Fired Thermal Power Plant.
(DoE Requirement)
Kalapara, Patuakhali
RPCL-NORINCO INTL. POWER LTD. (RNPL)
October, 2023 – April, 2024
Environmental Impact Assessment (EIA) for Coal Transportation (~1.5 km) and Jetty of Patuakhali 1320 MW Coal Fired Thermal Power Plant. (DoE Requirement)
Kalapara, Patuakhali
RPCL-NORINCO INTL. POWER LTD. (RNPL)
October, 2023 – July, 2024
Environmental Impact Assessment of the Establishment of Data Center Project (DoE Requirement)
Kagabala, Moulvibazar
Moulvibazar Solar Power Limited
September, 2023 – December, 2023
Environmental Impact Assessment (EIA) of Steel Manufacturing Mini Mill of Unitex Steel Mills Limited (USML) (DoE Requirement)
Muhuriganj, Feni
Unitex Steel Mills Limited
Aug 2023 – May 2024
Third Party Monitoring and Evaluation Consultancy for Bangladesh Regional Waterway Transport Project 1 (Dredging in Chittagong- Dhaka-Ashuganj IWT Corridor along with associated linked routes and construction of terminal with allied infrastructure) (WB funded)
Chittagong- Dhaka-Ashuganj IWT Corridor
Bangladesh Inland Water Transport Authority
2021-2025
Kantar [Dhanmondi & Banani Office] HSSE Audit Review and Onsite Inspection
Dhanmondi & Banani, Dhaka, Bangladesh
Enviro Solutions & Consulting Pte Ltd, Singapore
December, 2024 – January, 2025
Environmental Studies (Feasibility Study, Initial Environmental Examination (IEE), Environmental and Social Impact Assessment (ESIA)and Resettlement Action Plan (RAP)) in relation to Power Evacuation Fuel Gas Supply Pipeline & Associated Arrangements under Gas Transportation Facilities (GTF) for the Proposed Development of a Combined Cycle Gas Turbine Plant Project in Bangladesh. (ADB, AIIB & DoE Requirement)
Munshiganj
Powertek Energy Sdn Bhd
January 2023 – September, 2023
Environmental Studies (Feasibility Study, Initial Environmental Examination (IEE), Environmental and Social Impact Assessment (ESIA) and Resettlement Action Plan (RAP)) in relation to Power Evacuation Transmission Line & Associated Interconnection Facilities (EIF) for the Proposed Development of a Combined Cycle Gas Turbine Plant Project in Bangladesh. (ADB, AIIB & DoE Requirement)
Munshiganj
Powertek Energy Sdn Bhd & Gazaria Power Limited
January 2023 – September, 2023
Environmental Impact Assessment (EIA) for the project titled ‘Workover of well no. Kailashtila-2, Rashidpur-2, Rashidpur-5 and Sylhet-7’ under Sylhet Gas Fields Limited (SGFL)
Sylhet
Sylhet Gas Fields Limited (SGFL)
December 2022- Ongoing
Environment Management Plan (EMP) of Ashuganj 400 MW CCPP (East). (ADB Funded)
Ashuganj, Brahmanbaria
Ashuganj Power Station Company Ltd. (APSCL)
2023
Detail Feasibility Study (DFS), Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA) & Social Impact Assessment (SIA) and Design work (Township) for the construction of
➤ 3×600 MW gas based combined cycle power plant by replacing existing B-type residential area
➤ 2×600 MW gas based combined cycle power plant by replacing Unit 1-5 of APSCL.
➤ New Township at the suitable side of B-Type area (ADB compliant)
Ashuganj, Brahmanbaria
Ashuganj Power Station Company Limited
2023
Phase I Environmental Site Assessment Chancery and Annex Compounds of U.S. Embassy (ASTM E1527-13 Standard Practice for Phase I ESA)
Madani Avenue, Dhaka
Langan Engineering and Environmental Services, Inc.
2022
IEE & EIA of 15 MW HFO based Power Plant
Hatiya
Desh Energy Hatiya Power Company Ltd.
2022
IEE of Anlima 450 MW (Net) Capacity Gas/ R-LNG Based CCPP project
Meghnaghat, Narayanganj
Anlima Meghnaghat Power Plant Ltd.
June 2021- July 2022
Feasibility Study and Environmental studies for New Campus of Jagannath University
Keraniganj, Dhaka, Bangladesh
Jagannath University
2022-2023
Feasibility Study and Environmental studies for Bangladesh Power Management Institute (BPMI) Complex
Keraniganj, Dhaka, Bangladesh
Bangladesh Power Development Board (BPDB)
2022-2023
Environmental Impact Assessment (EIA) of Denitex Textile Industries Ltd.
Karnapara, Savar, Dhaka
Denitex Textile Industries Ltd.
July 2022- Oct 2022
Environmental Impact Assessment (EIA) & HIRA of Tarasima Apparels Ltd.
Saturia, Manikganj
Tarasima Apparels Ltd.
July 2022- Oct 2022
Environmental Impact Assessment (EIA) and HIRA of Cutting-Edge Industries Limited CEIL)
Gazipur
Cutting Edge Industries Limited (CEIL)
Sep 2022- Nov 2022
Environmental Impact Assessment (EIA) of Masco Exports Ltd.
Baghata, Palbari, Narsingdi
Masco Exports Ltd.
Oct 2022- Dec 2022
Techno-Economic Feasibility Study and Engineering Services, Tender Management Services for Construction of Land based LNG Terminal at Matarbari, Cox’s bazar.
Matarbari, Cox’s bazar
Tokyo Gas Engineering, Japan and Petro Bangla, Bangladesh.
2021-Ongoing
Bankable Feasibility Study & Environmental and Social Impact Assessment (ESIA) for a Dhaka Teaching Hospital with Alinea Capital Plant. (FMO; Dutch development bank)
Ashulia, Dhaka
Prime Bank Foundation (PBF)
Oct 2020- ongoing
Feasibility study & Environmental Impact Assessment (EIA), Social Impact Assessment (SIA) [including Resettlement Action Plan (RAP)] & Disaster Impact Assessment (DIA) of 600 MW Gas Based Combined Cycle Power Plant. (WB Standard)
Munshiganj Sadar and Gazaria Upazila, Munshiganj
Electricity Generation Company of Bangladesh (EGCB) Ltd.
2020- ongoing
Environmental Impact Assessment (EIA) of 10 MW Gas Engine Based Power Plant of Manticore Technology Ltd. (Unit- 2)
Ishwardi Export Processing Zone (EPZ), Paksey, Pabna
Manticore Technology Ltd. (Unit- 2)
2021
Environmental and Social Impact Assessment of Jetty of Meghnaghat 750 MW Combined Cycle Power Plant, Narayanganj, Bangladesh by Reliance Bangladesh LNG and Power Ltd. (ADB funded)
Narayanganj
Reliance Bangladesh LNG and Power Ltd.
2020
Environmental Management Plan (EMP) of Pearl Paper and Board Mills Ltd. (PPBML)
Sreerampur, Dhamrai, Dhaka.
BDG Magura Group
Ongoing
EIA of Arman Haque Denims Ltd. at Mirershorai Economic Zone
Mirershorai Economic Zone, Mirershorai, Chattogram
Arman Haque Denims Ltd.
2019-Ongoing
EIA of New Crushers’ Unit in the Existing LafargeHolcim Bangladesh Limited
Noarai, Chhatak, Sunamganj
LafargeHolcim Bangladesh Limited
2019
ESIA of Debonair Synthetic Fiber Ltd. (DSFL) at Chotanpara, Paragon, 10 no. Hobirbari Union, Square Master Bari, Valuka, Mymensingh, Bangladesh (IDCOL funded)
Valuka, Mymensingh
Debonair Synthetic Fiber Ltd. (DSFL)
March, 2019 to November 2019
ESIA of Bangladesh Auto Industries Ltd. at Mirershorai Economic Zone
Mirershorai Economic Zone, Mirershorai, Chattogram
Bangladesh Auto Industries Ltd.
2019-Ongoing
Construction Environment Management Plan (CEMP) of Patuakhali 1320 MW Power Plant Project
Patuakhali, Bangladesh
Ashuganj Power Station Company Ltd. (APSCL)
2019-2020
Preparation of Environmental Impact Assessment (EIA) for Construction of Walkway-Cycle way (Kolatoli to Laboni Point) Project.
Dhaka
16 ECB, Bangladesh Army
2019
ESIA of Raw Tech Ltd. A Hong Kong Bangladesh Joint Venture Private Limited Company at Bhaluka, Mymensingh. (IPFF II, Bangladesh Bank funded, WB standard)
Kashorghor, Habirbari, Bhaluka, Mymensingh
Raw Tech Ltd.
2019-Ongoing
IEE & ESIA of 750X2 MW LNG based Combined Cycle Power Plant. (ADB compliant)
Juidandi, Anwara-Banskhali, Chittagong
Reliance Power Ltd., India.
2018-Ongoing
IEE & ESIA of 2 Land based LNG station of TGE Japan and Petro Bangla
Moheshkhali, Cox’s bazar and Payra, Patuakhali
Tokyo Gas Engineering, Japan and Petrobangla
2017-2018
IEE & ESIA of a land-based LNG station of China Huanqiu Contracting & Engineering Corporation (HQC)
Moheshkhali, Cox’s bazar
China Huanqiu Contracting & Engineering Corporation (HQC) and Petrobangla, Bangladesh.
2017-2018
IEE & ESIA of 1320 MW Coal based thermal Power Plant of Union Resource Engineering Co Ltd, China.
Dhalghata, Matarbari, Moheshkhali, Cox’s Bazar, Bangladesh
Union Resource Engineering Co. Ltd., Bangladesh.
2017-2018
IEE & ESIA of 360 MW Combined Cycle Duel Fuel Power Plant
Shambhuganj, Mymensingh
Rural Power Co Ltd., Bangladesh.
2017
Site Screening report for 1320 MW Coal based power project of ITOCHU Corporation, Japan at Gaibandha & Dinajpur.
Gaibandha & Dinajpur
ITOCHU Corporation, Japan
2017
IEE & ESIA of 120 MW HFO fired Power Plant
Shikalbaha, Patia, Chittagong
Anlima Energy Ltd., Bangladesh.
2017
IEE & ESIA of 150 MW Duel Fuel Power Project at BEZA, Mirasharai, Chittagong.
Mirasharai, Chittagong
Bangladesh Economic Zone Authority
2017
IEE & ESIA of 750 MW LNG based Combined Cycle Power Plant (ADB funded project).
Sonargaon, Meghnaghat, Narayanganj
Reliance Power Ltd., India.
2016-2017
IEE & ESIA of Minigrid Solar Project
Shariatpur
Solar Electro Bangladesh Ltd.
2016-2017
IEE & ESIA of Chittagong Boarder Road Construction Project.
Banderban, Ragamati and Khagrachari
Bangladesh Army
2016-2017
IEE & ESIA of 1320 MW Coal based thermal Power Plant of POSCO E&C, Korea.
Matarbari, Moheshkhali, Cox’s Bazar
POSCO E&C, Korea.
2016
IEE & Baseline Environmental study of 660 MW coal based thermal power plant of Orion Power Dhaka Ltd. (Phase 2)
Gazaria, Mushiganj
Orion Power Dhaka Ltd.
2016
IEE & ESIA of 400 MW Combined Cycle Power Plant (East) of Ashuganj Power Co Ltd (ADB funded)
Ashuganj, Brahmanbaria
Ashuganj Power Station Co Ltd.
2016
Environmental and Social Impact Assessment of (ESIA) of Creative Paper Mills Ltd. (CPML)
Ganganagar, Murapara, Rupgonj, Narayangonj
Creative Paper Mills Ltd. (CPML)
March 2015- September 2015
Environment and Social Management & Monitoring Plan (ESMMP) of Ashuganj 225 MW CCPP of APSCL.
Ashuganj, Brahmanbaria
Ashuganj Power Station Company Ltd. (APSCL).
2015
IEE & ESIA of United Ashuganj Power Ltd
Ashuganj, Brahmanbaria
United Ashuganj Power Ltd.
2014
IEE & ESIA of Karnafully Dry Dock Ltd, Chittagong, Bangladesh, 2014 in association with ERM (WB funded)
Chittagong
Karnafully Dry Dock Ltd.
2014
IEE & ESIA of Baraka Potenga Power Ltd
Potenga, Chittagong
2013
Environmental and Social Legislation Research in the People’s Republic of Bangladesh with Japan NUS Co. Ltd., Japan (JBIC funded project)
Dhaka
Japan Bank for International Cooperation (JBIC)
2019-2020
Legislative Survey of Nippon Koei, Japan
Bangladesh
Nippon Koei, Japan
2018

Environmental Monitoring Projects

Project Name Location Client Duration
Quarterly Environmental Monitoring of Operational Phase of Matarbari 2×600 MW Ultra Critical Coal Fired Power Plant JICA & GoB Funded
Matarbari, Cox’s Bazar
Coal Power Generational Company Bangladesh Limited (CPGCBL)
May 2025 – Ongoing
Third Party Monitoring & Evaluation Consultant for Environmental Safeguards (Package # BRWTP-S12/3) under the Project titled, “Bangladesh Regional Waterway Transport Project 1 (Dredging in Chittagong-Dhaka-Ashuganj IWT Corridor along with associated linked routes and construction of terminal with allied infrastructure) World Bank Financed
Chittagong- Dhaka-Ashuganj IWT Corridor
Bangladesh Inland Water Transport Authority (BIWTA)
January 2021- ongoing
Quarterly E&S Monitoring of U. K. Bangla Cement Limited (UKBCL) at Hoseindi Economic Zone KfW Financed through BIFFL
Gazaria, Munshiganj
U. K. Bangla Cement Limited (City Group)
May 2025 – Ongoing
Quarterly Environmental Monitoring of 2X660 MW Coal Fired Thermal Power Project of SS Power I Limited at Banskhali, Chattogram. (Operation Phase) EXIM Bank of China Financed
Banskhali, Chattogram
SS Power I Limited
Dec 2023 – Ongoing
Monthly Environmental Monitoring, Preparation of CEMP & Two Seasons Baseline data collection of 2X660 MW Coal Fired Thermal Power Project of Ashuganj Power Station Company Ltd. at Patuakhali.
Kalapara, Patuakhali
Ashuganj Power Station Company Limited
January 2020 – Ongoing
Quarterly Environmental Monitoring of 2X660 MW Coal Fired Thermal Power Project of SS Power I Limited at Banskhali, Chattogram. (Construction Phase) EXIM Bank of China Financed
Banskhali, Chattogram
SS Power I Limited
April 2019- Sept. 2023
Monitoring of Environmental & Social Safeguard for Ashuganj 400 MW CCPP (East) of CNTIC- CCOEC Consortium at APSCL.
Ashuganj, Brahmanbaria
Ashuganj Power Station Company Limited
January 2018 – Ongoing
Monitoring of Environmental & Social Safeguard for Ashuganj 400 MW CCPP (East) of CNTIC- CCOEC Consortium at APSCL. MIGA Financed
Ghorashal, Palasha, Narsingdi
Bangladesh Chemical Industries Corporation (BCIC)
January 2018-December 2023
Quarterly Environmental Health and Safety Monitoring of SASEC Road Connectivity Project-II (WP-10, WP-11, WP-12): Improvement of Mokamtola Bus stop to Begum Rokeya University; 2-lane Highway to 4-lane Highway. ADB Financed
Mokamtola Bus stop to Begum Rokeya University
China Construction Seventh Engineering Division Corp. Ltd
July 2020- December 2021
Quarterly & Monthly Environmental Monitoring of 2×660 MW Maitree Super Thermal Power Plant Project at Bagerhat with CEGIS. EXIM Bank (India) Financed
Rampal, Bagerhat
Bangladesh Power Development Board (BPDB)
April 2018- Ongoing
Quarterly Health, Safety and Environmental Monitoring Report of 200 MW HFO-Fired Power Plant of Desh Energy Chandpur Power Company Limited at Gunrajdi, Chandpur, Bangladesh. One Bank Limited Financed
Gunrajdi, Chandpur
Desh Energy Chandpur Power Company Limited.
January 2018 – Ongoing
Environmental Health and Safety Monitoring for Lebukhali Bridge KFAED Financed
Lebukhali, Barishal
Longjian Road & Bridge Co. Ltd.
2021
Health, Safety and Environmental Monitoring of Shahjibazar 100 MW Gas Turbine Power Plant as Owner’s engineers.
Shahjibazar, Habiganj
Bangladesh Power Development Board (BPDB)
2019
CEMP of SASEC Road Connectivity Project-II (WP-10): Improvement of Mokamtala Bus stop to Palashbari Bus Stop (KM 106+000~KM 133+200) to 4-lane Highway (ADB funded project)
Bogra, Gaibandha
China Construction Seventh Engineering Division Corp. Ltd.
2019
CEMP of SASEC Road Connectivity Project-II (WP-11): Improvement of Palashbari to Bara Darga Bus Stand 2-lane Highway (KM 106+000~KM 133+200) to 4-lane Highway (ADB funded project)
Gaibandha, Rangpur
China Construction Seventh Engineering Division Corp. Ltd.
2019
CEMP of SASEC Road Connectivity Project-II (WP-12): Improvement of Bara Darga Bus stop to Begum Rokeya University (KM 133+200~KM 157+000) to 4-lane Highway (ADB funded project)
Rangpur, Bangladesh
China Construction Seventh Engineering Division Corp. Ltd.
2019
Baseline survey and Monthly Monitoring Report of Patuakhali 1320 MW Coal based super thermal power plant project.
Patuakhali, Bangladesh
Ashuganj Power Station Company Ltd.
2020- Ongoing
Third Party E&S Monitoring of Ghorasal Polash Urea Fertilizer Project (GPUFP) with SRK Consulting (South Africa) (Pty) Ltd. (Financed by the MIGA-guaranteed loan)
Ghorasal, Palash, Narsingdi
Bangladesh Chemical Industries Corporation (BCIC)
2020- Ongoing
Quarterly Health, Safety and Environmental Monitoring Report of 200 MW HFO-Fired Power Plant of Desh Energy Chandpur Power Company Limited
Siddhirganj, Chadpur
Desh Energy Chandpur Power Company Limited
2018-Ongoing
Monthly Environmental Health & Safety Monitoring Report Ashuganj 400MW Combined Cycle Power Plant (East) Ashuganj, Brahmanbaria. (ADB funded)
Ashuganj, Brahmanbaria
Ashuganj Power Station Company Ltd. (APSCL).
2018-2023
Monthly Environmental Health & Safety Monitoring Report Ashuganj 450 MW Combined Cycle Power Plant (South) Ashuganj, Brahmanbaria ADB Financed
Ashuganj, Brahmanbaria
Ashuganj Power Station Company Limited
2016
Environment and Health & Safety Monitoring Plan of Ashuganj 225 MW CCPP of APSCL
Ashuganj, Brahmanbaria
Ashuganj Power Station Company Limited
2015
Monthly Environmental Health & Safety Monitoring Report Ashuganj 450 MW Combined Cycle Power Plant (South) Ashuganj, Brahmanbaria (ADB Financed)
Ashuganj, Brahmanbaria
Ashuganj Power Station Company Ltd. (APSCL).
2017-2018
Monthly Environment and Health & Safety Monitoring Plan of Ashuganj 225 MW CCPP of APSCL (ADB Financed)
Ashuganj, Brahmanbaria-3402, Bangladesh
Ashuganj Power Station Company Ltd. (APSCL)
2017-2018
Environmental Health and Safety Monitoring
Jamalpur, Baushi, Sarishabari, Mymensing, Trishaal, Gafaorgaon, Sreepur, Joydebpur, Mirsharai, Mirsharai
Bangladesh Railway
2018
Environmental Health and Safety Monitoring of the preparation of EIA/ESIA of different power projects
Mongla, Sylhet, Rajshahi and Panchagar
Center for Environmental and Geographic Information Services (CEGIS)
2018
Environmental Health and Safety Monitoring of Kushiara Power Plant, Sylhet
Sylhet
Kushiara Power Company Limited
2018
Environmental Health and Safety Monitoring of Summit Bibiana and Summit Meghnaghat
Meghnaghat, Narayanganj
Summit Power Ltd
2017
Environmental Health and Safety Monitoring of Shanta Group
Savar, Dhaka
DEPZ
2017
Environmental Health and Safety Monitoring of UniMed & UniHealth Manufacturers Limited
B.K. Bari, Mirzapur, Gazipur
UniMed & UniHealth Manufacturers Limited
2016
Environmental Health and Safety Monitoring of Eskayef Bangladesh Ltd
Mirpur – 1. Dhaka
Eskayef Bangladesh Ltd
2016
Environmental Health and Safety Monitoring of Niagara Textiles Ltd
Kaliakoir, Gazipur
Niagara Textiles Ltd
2016
Environmental Health and Safety Monitoring of Youngone Dhaka Complex
Savar, Dhaka
Youngone
2015
Environmental Health and Safety Monitoring of Tuv Sud Bangladesh Pvt. Ltd.
Tuv Sud Bangladesh Pvt. Ltd
2015
Environmental Health and Safety Monitoring of Meghna Energy Ltd.
Kanchpur, Narayanganj
Meghna Energy Ltd.
2015
Environmental Health and Safety Monitoring of Aristopharma Ltd.
Kanchpur, Narayanganj
Aristopharma Ltd
2014
Environmental Health and Safety Monitoring of DBL Group
Konabari, Kasimpur, Gazipur
DBL Group
2014
Environmental Health and Safety Monitoring of Lenny Fashion Ltd, DEPZ
Savar, Dhaka
Lenny Fashion Ltd
2014
Environmental Health and Safety Monitoring of Palmal Group (All Project)
Palmal Group
2014
Environmental Health and Safety Monitoring of Berger Paints Bangladesh Ltd
Nabinagar, Savar
Berger Paints Bangladesh Ltd
2014
Environmental Health and Safety Monitoring of Channel I –Impress Group (all Textile & Garments Division)
Channel I –Impress Group
2014
Environmental Health and Safety Monitoring of Apex Tannery Limited
Shafipur, Kaliakoir, Gazipur.
Apex Tannery Limited-Unit-2
2014
Environmental Health and Safety Monitoring of Samuda Chemical Complex Ltd, Sikirgaon, Gazaria, Munshigong
Samuda Chemical Complex Ltd
Sikirgaon, Gazaria, Munshigong
2014
Environmental Health and Safety Monitoring of PENDEKAR ENERGY, Haripur power Limited, Kuripara Bazar
Kuripara Bazar, Haripur
Pendekar Energy
2014
Environmental Health and Safety Monitoring of Heidelberg Power Ltd., Potenga, Chittagong
Potenga, Chittagong
Heidelberg Power Ltd.
2014
Environmental Health and Safety Monitoring of RAK Power Ltd
Sreepur, Gazipur
RAK Power Ltd
2014
Environmental Health and Safety Monitoring of Cemex Power Ltd
Madanganj, Narayanganj
Cemex Power Ltd
2014
Environmental Health and Safety Monitoring of Seven Circle (Bangladesh) Ltd
Kaligonj, Gazipur
Seven Circle (Bangladesh) Ltd- Seven Ring Cement
2014
Environmental Health and Safety Monitoring of Mir Cement Ltd
Murapara, Rupgonj, Narayangonj.
Mir Cement Ltd
2014
Environmental Health and Safety Monitoring of Heidelberg Cement Bangladesh Ltd (Scan & Ruby Cement)- Kanchpur & Chittagong Plant
Kanchpur & Chittagong
Heidelberg Cement Bangladesh Ltd
2014
Environmental Health and Safety Monitoring of Sepal Garments Ltd
Tejgaon I/A Dhaka-1201
Sepal Garments Ltd.
2013
Environmental Health and Safety Monitoring of Shungshing Power Ltd
Kaliganj, Gazipur
Shungshing Power Ltd.
2013
Environmental Health and Safety Monitoring of Cemex Cement Bangladesh Ltd
Madangonj, Bandar, Narayangonj.
Cemex Cement Bangladesh Ltd
2013
Environmental Health and Safety Monitoring of 110 MW COVANTA Bangladesh Operating Ltd
Haripur, Bandar, Narayangonj
110 MW COVANTA Bangladesh Operating Ltd.
2013
Environmental Health and Safety Monitoring of General Pharma
Kashimpur, Gazipur
General Pharma
2012
Environmental Health and Safety Monitoring of British American Tobacco
Manikgonj & Kushtia Plant
British American Tobacco
2012
Environmental Health and Safety Monitoring of Sinha Group
Kanchpur, Narayanganj
Sinha Group
2012
Environmental Health and Safety Monitoring of Ha-Meem Denim Limited
Mouna, Sreepur, Gazipur
Ha-Meem Denim Limited
2012
Environmental Health and Safety Monitoring of R.A.K. CERAMIC (Bangladesh) Pvt. Limited
Jasimuddin Avenue, Uttara, Dhaka
R.A.K. CERAMIC (Bangladesh) Pvt. Limited
2012
Environmental Health and Safety Monitoring of Cosmopolitan Industries Pvt. Limited
Khejurbagan, Bara Ashulia, Savar, Dhaka
Cosmopolitan Industries Pvt. Limited
2012
Environmental Health and Safety Monitoring of American Efird (Bangladesh) Limited
93 – 94, Islampur, Gazipur
American Efird (Bangladesh) Limited
2012
Environmental Health and Safety Monitoring of Bata Shoe Company (Bangladesh) Ltd
Tongi, Gazipur, Bangladesh
Bata Shoe Company (Bangladesh) Ltd
2012
Environmental Health and Safety Monitoring of Summit Purbanchol/Uttaranchol Power Ltd
Rupgonj, Maona Gazipur, Jangalia Comilla & Ullapara Sirajgonj Unit
Summit Purbanchol/Uttaranchol Power Ltd
2011
Environmental Health and Safety Monitoring of Quazi Enterprise Ltd
Shovapur, Rajfulbaria, Savar, Dhaka
Quazi Enterprise Ltd
2011
Environmental Health and Safety Monitoring of Texeurop (BD) Ltd
Vogra, Joydebpur, Gazipur.
Texeurop (BD) Ltd
2010
Environmental Health and Safety Monitoring of Summit Power Ltd
Narsingdi & Chandina
Summit Power Ltd
2010
Environmental Health and Safety Monitoring of Fakir Apparels Ltd
Anayetnagar, Fatullah, Narayangonj
Fakir Apparels Ltd
2009
Environmental Health and Safety Monitoring of Nestle Bangladesh Limited
Rajendrapur Cantonment, Sreepur, Gazipur
Nestle Bangladesh Limited
2009
Environmental Health and Safety Monitoring of Lafarge Surma Cement Limited
Noarai, Chhatak, Sunamganj
Lafarge Surma Cement Limited
2009
Environmental Health and Safety Monitoring of Emirates Cement Bangladesh Limited
Mukterpur, Munshigonj
Emirates Cement Bangladesh Limited
2009
Environmental Health and Safety Monitoring of Asian Paint (Bangladesh) Limited
Bahadurpur, Gazipur
Asian Paint (Bangladesh) Limited
2008
Environmental Health and Safety Monitoring of Abedins Textile Mills Limited
Khalitakhali Karnapara, Savar, Dhaka
Abedins Textile Mills Limited
2008
Environmental Health and Safety Monitoring of Zaber & Zubair Fabrics Ltd
Pagar, Tongi, Gazipur
Zaber & Zubair Fabrics Ltd
2008
Environmental Health and Safety Monitoring of BOC Bangladesh Limited
Dhaka & Rupgonj
BOC Bangladesh Limited
2008

ETP, STP, WTP & ZLD Projects

Project Name Location Client Duration
150 cum/hour MBR System ETP
Savar, Dhaka
HR Textiles Ltd.
2020
75 cum/day MBBR System STP
Tejgaon, Dhaka
House of Sunshine Knitwear Innstar Ltd.
2022-2023
120 cum/hour Biological Process ETP
Mymensingh
Dacca Textile Ltd
2018
12 cum/hour Physio Chemical Process ETP
Hemayetpur, Dhaka
Jalalabad Metal Ltd.
2020-2021
10 m3/hour MBBR Process ETP
Kalurghat Industrial Area, Chattogram.
Clifton Cotton Mills Ltd
2022-2023
36 m3/day Physio-Chemical Process ETP
North Patenga, Chattogram.
Ventura (Bangladesh) Limited
2022-2024
3.0 m3/hour MBBR System STP
Tejgaon, Dhaka
Innstar Group
2022-2023
22KLD, 6.6 KLD MBBR System STP
Sreepur, Gazipur
Paramount Group
2025-Ongoing
22KLD, 18KLD, MBBR System STP
Hemayetpur, Pabna
Dynamic Sun Energy pvt ltd
2024-2025
2 m3/hr Physio-Chemical Process ETP
Gazipur
Colotext Appralse Ltd
2024
40KLD MBBR System STP
Sreepur, Gazipur
Chittagong Denim Mills Ltd
2025-Ongoing
80 KLD MBBR System STP
Tejgaon, Dhaka
Desh Tower
2024-Ongoing
10 cum/hour Biological Process ETP
Shalna, Gazipur
Colotex Apparel Ltd.
2017-2018
80 cum/hour Biological Process ETP
Nobinagar, Savar
East West Suiting Milles Limited
2016-2017
10 cum/hour Biological Process ETP
Valuka, Mymensingh
Lovello Ice-Cream (Taufika Group)
2013-2014
5 cum/hour Biological Process ETP
Gazipur bypus, Gazipur
Colossus Apparel Limited
2017-2018
30 cum/hour Biological Process ETP
Board bazaar, Gazipur
Sepal Washing Plant Ltd.
2012-2013
30 cum/hour Physio Chemical Process ETP
Tongi, Gazipur
Noman Fabrics Ltd.
2012-2013
60 cum/hour Biological Process ETP
Panchdona, Narsingdi
Talha Texpo Ltd.
2013-2014
30 cum/hour Physio Chemical Process ETP
Mukterpur, Munshigonj
Barnali Fabrics Ltd.
2014-2015
50 cum/hour Physio Chemical Process ETP
Shirirchala, Gazipur
SM Knitting Industries Ltd. (Dyeing)
2014-2015
150 cum/hour Biological Process ETP
Tongi, Gazipur
Zaber & Zubair Fabrics Ltd.
2012-2013
30 cum/hour Biological Process ETP
Kalshi, Mirpur, Dhaka
Kazipur Fashions Ltd., (Textile Washing)
2012-2013
30 cum/hour ETP
Vhatiary, Chittagong
Abul Khair Steel Mills Ltd.,
2011-2012
50 cum/hour. Biological Process ETP
Gazipur
BRAC Dairy and Food Products
2011-2012
30 cum/hour. Biological Process ETP
Ashulia, Savar, Dhaka
S.Suhi Industrial Park Ltd
2010-2011
50 cum/hour Physio Chemical Process ETP
Vhaluka, Mymensingh
Bally Yarn Dyeing Ltd.
2012-2013
60 cum/hour Physio Chemical Process ETP
Sreepur, Gazipur
Adib Dyeing Mills Ltd.
2013-2014
50 cum/hour Physio Chemical process ETP
Tongi, Gazipur
Everway Yarn Dyeing Mills Ltd.
2013-2014
40 cum/hour Physio Chemical Process ETP
Kaliakair, Gazipur
Dong Bang Textiles Ltd.
2014-2015
30 cum/hour Biological Process ETP
Tejgaon, Dhaka
Sepal Garments Ltd
2015-2016
60 cum/hour Physio Chemical Process ETP
Rupganj, Narayanganj
ALTEX Industries Ltd.
2012-2013
40 cum/hour Physio Chemical Process ETP
Savar, Dhaka
Mega Yarn Dyeing Mills Ltd.
2011-2012
50 cum/hour Physio Chemical Process ETP
Kaliakair, Gazipur
Haesong (BD) Corporation Ltd
2012-2013
30 cum/hour Biological Process ETP
Ashulia, Svar, Dhaka
Mark Terry Ltd.
2013-2014
60 cum/hour Physio Chemical Process ETP
CEPZ, Chittagong
Crown Mills (BD) Ltd
2015-2016
50 cum/hour Physio Chemical process
Shafipur, Gazipur
Mahmud Denims Ltd.
2010-2011
30 cum/hour Physio Chemical process
Shafipur, Gazipur
Concorde Knitting & Dyeing industries Ltd.
2013-2014
60 cum/hour Physio Chemical Process ETP
Hwa well Textile (Bd) Ltd.
Myminsingh
2013-2014
30 cum/hour Biological Process ETP
Abcott Industries Ltd.
Dhaka
2014-2015
10 cum/hour Biological Process ETP
Danish Condensed Milk Ltd.
Siddirgonj, Narayanganj
2010-2011

Our Team is Ready to Assist

We are here to support your Environmental Management needs. Whether you require Laboratory Testing, Environmental Assessments, or Consultancy Services

© Copyright 2020 powered by AECL BD

Design and Developed by Shahidul Shakil
Scroll to Top